Haha, it's getting there man! The pre turbo exhaust is fully welded including the Tial 44mm MVR wastegate I did yesterday. Still need to make the dump pipe for turbo and wastegate, but it's not a priority at the moment.

On the intake side I need to weld the Tial Blow off valve, HPX MAF sensor, and MAP sensor flanges to the Intercooler piping.

Oil cooler needs to be mounted and oil lines ran...

I need to weld a -16AN bung to the coolant crossover pipe to go to the radiator...

Radiator fan shroud is done, just need to cut out the 2 holes for it..

I should be pulling the engine out today so I can mount the flywheel, clutch, and pp and after that I'll be ready to start wiring and hopefully get it started. A lot done, but still so much to do. I'm just thankful I dont have to touch the transmission, suspension, and anything else on the car once it's running. Just go straight to driving and street tuning.